-
Micro Stepper Motor
-
Permanent Magnet Stepper Motor
-
Geared Stepper Motor
-
Linear Stepper Motor
-
Slider Stepper Motor
-
Hybrid Stepper Motor
-
Small DC Gear Motor
-
ROV Thruster Motors
-
Micro Metal Gearmotor
-
Micro Gearbox
-
Position Control Stepper Motor
-
3D Printer Stepper Motor
-
Stepper Motor Driver
-
DC Motor Controller
-
Lead Screw And Nut
-
Andres BlancoThe thruster have arrived correctly. I tested them on the ROV and we are very happy with the result. The epoxy interior finish is very good and the power of the motors in relation to the size is quite good. -
Gregoire LangeThe cooperation between Changzhou Vic-Tech Motor Tech and our company was just great. Good understanding of our needs, great willing to solve our problems. I recommend ! -
David MoleveltProfessional and clear communication. Order was shipped in time. Counter connectors where added to the shipment. Driver works like we agreed ! -
Buildstorm Private LimitedThe product works as expected, it was packed nicely. Seller responds very quickly and helps in making a buying decision. They are ready to customize the product for you. -
Ashley GriffinShipment was received very quickly. Product was well protected by packaging. Company rep was cordial and kind. A Plus rating!
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
| Place of Origin | China |
|---|---|
| Brand Name | VIC-TECH |
| Certification | RoHS, ISO9001 |
| Model Number | VSM20A-48S |
| Minimum Order Quantity | 1Unit |
| Price | $11~$32/Unit |
| Packaging Details | Standard export package in corrugated carton (Mass production). |
| Delivery Time | 15-30 work days |
| Payment Terms | Western Union, T/T, L/C, |
| Supply Ability | 100000 Units/year |
| Motor Type | Linear Stepper Motor | Motor Diameter | 20 Mm |
|---|---|---|---|
| Step Angle | 7.5°/step | Phase Current | 160 MA/phase |
| Phase Number | 2 Phases (Bipolar) | Coil Resistance | 74.5Ω/phase |
| Highlight | permanent magnet linear stepper motor,20mm diameter linear stepper motor |
||
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S is 20mm diameter linear stepper motor with 135mm length extra long trapezoidal lead screw. The length of lead screw is adjustable.
Besides lead screw, motor’s resistance, step angle can all be customized.
Customers can adjust all the parameters based on their own requirement.
Screw lead determines motor’s linear speed and thrust, with longer lead, motor has higher linear speed, with smaller linear pushing force/thrust.
We have two different types of step angle, including 7.5° and 15°/step.
With higher rated voltage, motor has higher coil resistance, and it depends on customer’s power supplier and driver parameters.
Typical applications:
* Medical Equipment
* Linear Robotic Control
* Precision Calibration
* High Precision Valve
* Other Precise Position Movement
Plus tt has extra low noise and high stability.
![]()
Design Layout (Unit:mm)
![]()
Parameter sheet:
| Motor type | Linear stepper motor |
| Motor diameter | 20mm |
| Rated power | 3.4W |
| Rated voltage | 12V DC |
| Phase current | 160mA/pahse |
| Phase resistance | 74.5Ω/phase |
| Phase inductance | 36 mH/phase |
| Step angle | 7.5°/step |
| Screw lead | 0.6096mm (customizable) |
| Step length | 0.0127mm/step |
| Leads crew length | 135 mm (customizable) |
| Phase No. | 2 phases |
| Driving method | 2-2 excitation |
Chart of Thrust vs speed(PPS):
![]()
Competitive Advantage
-
High quality and the best price.
-
Fast deliver,storage company and rich inventory
-
Near Shanghai port, the traffic is very convenient.
Product Detail Presentation
![]()

